overall_plant
In the centre of Oakleigh very close to Oakleigh Railway Station and the shopping district is this ruin of a boiler house of sizeable proportions. The factory around it has been demolished and the walls of the structure have been removed. The remains are surrounded by a chain link fence. The equipment inside is fairly intact although everything that could trap someone has been opened by method or force. There is quite a bit of graffiti. I would like to get inside the chain link and do some close up photography of this plan before it goes so if you know who has the key to the lock and can authorise entry please contact me.
The installation seems to be a pair of water tube boilers (where water runs through tubes in the fire space) that was likely coal fired. There is a loader for the coal into a supply hopper where it is fed into the firebox from there. One firebox for both boilers in the bank.
the_stack
The stack is an impressive brick structure I would guess at around 35m high. Unfortunately it has been broken through. This would be a fantastic structure to make as the centre piece of a new building much like the shot tower within Melbourne Central. I hope this is slated for preservation rather than destruction.
chimney_holeLooking inside the chimney you can see how substantial the stack structure is with around four to six layers of bricks.
fuel_loader 
Fuel is loaded from ground level using this massive loader tower. It is dumped in a hopper out of the truck (probably a train originally given its proximity to the railway line) and is lifted up to the hopper at the top of the structure. The loader likely has an electric or perhaps a steam engine at the top of the tower driving a bucket chain. This is only a guess because I did not have access.
fuel_hopper
This image shows the fuel storage hopper that holds the fuel until it is needed to satisfy the hungry firebox.
fuel_inlet_into_firebox
The hopper discharges into the inlet to the firebox. I can see an electric motor here, I would guess it powers a crusher and perhaps a screw that throws the fuel into the firebox in a wide spread pattern. There is also some cool graffiti.
weir_pump2
This weir pump (what is left of it) would have been one of the water supplies for the boiler. There should have been another pumping mechanism around somewhere. Weir pumps always throw dribbles of water this would have been contained by the small dam around the pump.
control_board
What little is left of the control board probably had some electrical controls and the steam pressure gauges.
boiler_top_above_water_tube_space2
You can see the tops of the boiler barrels here, I have presumed without information that this is likely a watertube boiler where the tubes descend from the barrel down to the combustion space.
You can see that the two boilers form a bank with multiple tubes joining the two boilers. The massive steam pipe coming from the top of the righ hand boiler gives some idea of the steam generation capacity of this plant.
boiler_top_above_water_tube_space
This is the other side of the boiler barrels. There are what look like man holes into the combustion space. An awful but necessary inspection job.
I would like to find out the future for this structure and see if it would be possible to legally gain entry to photograph the inside.